Pale stucco waterfront home with a shaded lanai, teak seating and shellstone terrace beside blue-green water.

Bimini Basin in Cape Coral: Dock-and-Dine Options and Plans

If you take a boat up the Caloosahatchee into Bimini Basin this fall, the easy place to stop is behind a seafood restaurant. The city has its own public mooring field planned for the basin, with a dinghy dock and a pump-out station. It is still in federal review, and the city's project page expects Army Corps approval in March 2027. Meanwhile, the City Council's final hearing on Bimini East was set for Wednesday, October 21. That project would lease Four Freedoms Park to a developer for 99 years and change the shoreline those public boating pieces were designed around.

So the basin's public boating plans are still on paper, and a private dock is filling that role. Here is what that looks like from the water.

The dock that works today

Bimini Basin Seafood & Cocktails opened February 28 at 458 Tudor Drive, behind Bimini Square. It's a 225-seat, open-air restaurant from Phelan Family Brands, the company behind Pinchers and Deep Lagoon Seafood. The dock is first-come, first-served, and you can't reserve a slip. Grant Phelan told the Cape Coral Breeze in March that the slips had not filled up yet, and said:

"They can come in with boats of any size. There is plenty of water, lots of depth and more than enough parking for boats. We have dock attendants to help catch lines and tell you where to park."

The slip count has grown since opening. Opening coverage reported 30 designated slips. The restaurant's site and the City of Cape Coral's Bimini Square page now list 42 dock-and-dine slips. No dock fee has been published, so call ahead if that matters to you. Call ahead about hours too. The Breeze reported 10 a.m. to 11 p.m. daily, and the News-Press reported 11 a.m. to 10 p.m.

Phelan told the Breeze that reservations are strongly recommended for dining tables, while the bar is always first-come, first-served. That makes the bar the easier stop when you arrive by boat without a plan. Two happy hours run every afternoon: Bimini Bites, a food happy hour from 2 to 5 p.m., and Bimini Sips, a drinks happy hour from 2 to 6:30 p.m.

The menu pulls the most popular dishes from four Phelan restaurants. It includes a seafood tower, Hogfish Bimini Style, chili-rub tripletail, miso-glazed Chilean sea bass and black grouper Oscar. In its opening review, the News-Press singled out the crab cakes with Key lime mustard and the fried hogfish handheld with mango jalapeño remoulade.

The landside half of the block

The restaurant is the waterfront piece of Bimini Square, a $100 million, roughly six-acre project at 440 Cape Coral Parkway East by Crowne Development. Its ribbon cutting was February 5, 2026. The rest of the block is now running: 218 apartments, a two-story Lee Health outpatient facility that is seeing patients, a 25-slip marina dock and a parking garage.

The second restaurant is House of Omelets. The News-Press covered its opening in May as a fancier location of the breakfast-and-lunch spot. If you come by car, there's a large garage across the street from the seafood restaurant, plus valet and street parking.

So breakfast, dinner and a doctor's appointment are all within one block of the water. What the basin doesn't have yet is a public place to leave a boat overnight.

The public boating pieces are a permit away

The city's Bimini Basin Mooring Field Project covers 15 mooring buoys at Four Freedoms Park. It also includes a new seawall to replace the park's existing one, a dinghy dock, a pump-out station, a Captain's Walk with connecting sidewalks, and a modular building with public and private restrooms, a shower, laundry and storage. The permits have moved like this:

  1. December 23, 2024: the city submits its Army Corps of Engineers permit application.
  2. August 22, 2025: the Florida Department of Environmental Protection permit is issued.
  3. October and November 2025: the federal government shutdown delays the Army Corps review.
  4. March 2027: the month the city expects Army Corps approval.

The city's July 2026 Community Redevelopment Agency report still listed the project under "Design and Permitting." The Breeze's October 8 coverage of Bimini East calls it the city's "installed mooring field," but the city's own project records say otherwise. As of this fall, there are no public moorings to pick up in the basin. March 2027 is when the city expects the federal permit. Construction would come after that, so it isn't an opening date.

That gap explains why the restaurant dock matters right now. Until the mooring field, dinghy dock and pump-out are built, the closest thing to public tie-up space on the basin is run by a restaurant, and its rules are restaurant rules.

Four Freedoms Park, as it stands this fall

The shoreline those moorings were planned for is still a small neighborhood park. Four Freedoms Park covers 3.2 acres, with a fenced playground, open grass, picnic areas, a pavilion, restrooms open sunrise to sunset, and a beach meant for sunbathing only. Florida Weekly has described the park as the main access point for kayaks on the basin.

Its biggest night on the water is coming up. The city's free Holiday Boat-a-Long is scheduled for Saturday, December 19, 2026, at Four Freedoms Park. The schedule includes stage entertainment, food trucks, crafts, Santa, a boat parade and a movie after the parade.

What Bimini East would change on the water

Bimini East is the proposed 34-acre, $500 million project from Bimini Basin Redevelopment Co. and Crown Development, the developer of Bimini Square. According to the Cape Coral Breeze, the plan allows up to 900 homes, about 250 hotel rooms, medical and office space, ground-floor retail, a bandshell and public open space. For boaters, four terms in the agreements stand out:

  • Slips: a marina with 50 boat slips, at least half for public use and up to a quarter for boat rentals or ferry service. Dockage charges are allowed.
  • Moorings: the developer would operate and maintain the city's mooring field.
  • Parking: 480 spaces permanently set aside for public use. Parking charges are allowed.
  • The park: a 99-year lease of Four Freedoms Park at $1 a year, with the city keeping the name and a covenant for public recreational use.

Assistant City Manager Mark Mason explained the park terms at the first hearing, as reported by the Breeze:

"We are leasing Four Freedoms Park. It will be altered, but will still be a park. We are also going to have another acre of land within the 20 acres we own that will be a park that will have two tennis courts plus a playground within it."

According to the same report, the programs now held at Four Freedoms Park would move permanently to the South Cape Community Center at Presbyterian Church. City staff described that as a transition plan similar to the one used for Yacht Club programming.

The construction timeline is long. Within six months after closing, the developer would submit civil-engineering permit applications for the first phase, including the marina. The first phase would start within 24 months, and the agreements require a certificate of occupancy for vertical construction by October 1, 2032. Closing also depends on environmental diligence and a separate "marina gate."

The second and final public hearing was scheduled for 4 p.m. Wednesday, October 21, at City Council chambers, 1015 Cultural Park Blvd. The city's meeting records will show how the vote went. Whatever the result, the public slips and the reworked park are years away under that schedule. This winter's Boat-a-Long will happen at Four Freedoms Park as it is today, and dinner by boat still means a slip behind Bimini Basin Seafood & Cocktails.

If you're weighing a canal home in the South Cape, Charles Weinstein can walk you through what Bimini Basin offers boaters today and what is still in permits. Let's Connect.

Work With Charles

Charles delivers a refined real estate experience built on personalized service, strong negotiation, and in-depth knowledge of both luxury homes and new construction. From your first conversation to closing day, he is committed to making every step seamless, informed, and focused on achieving your goals.